I want to build an above ground square concrete tank.
24 feet x 24 feet filled with water 5 feet deep.
I want to pour a slab and build walls on the slab.
How thick should the slab be. And what about reinforcement.
I realize that I would probably be better off to erect
forms and pour the walls as a monolithic casting.
But I have a different idea for the walls.
Concrete block walls using 8 inch block to form the interior wall.
Then another exterior wall with a space between the two walls.
The blocks would be filled with concrete and the space
would also be filled with concrete. All pinned to the slab.
How wide should the space between the walls be.

I saw this same design in a book about 30 years ago.
It was for an inground swimming pool.
And the space between walls was 4 inches.
But I want to build it above ground.
And I need to know how thick the space should be.

I can't seem to find an above ground pool
that is at least 5 feet deep. So I will build one.

Thanks for any and all advice.
You're also welcome to tell me I have fluff for brains.
But I already know that part.

Pooh Bear
 
   / Need a Structural Engineer - Concrete Wall #2  
Can't answer your question but I had sort of the same problem. My wife does water aerobics all the time and we were thinking about a pool kind of thing but no where could we find one the right depth which was around 5'.
We since dropped it cause it's her social time with the other ladies.
 
   / Need a Structural Engineer - Concrete Wall
  • Thread Starter
#3  
That's what I am wanting it for, water aerobics.
There's a couple of places over in Chattanooga I could go.
But it costs almost $15 in gas to drive there and back.
I could get a season pass for the pool here but they are
only open when school is out and then only till 4pm every day.
I have been wanting a pool anyway. So this seems like the best way to go.

Pooh Bear
 
   / Need a Structural Engineer - Concrete Wall #4  
Seems to me that is going to be very thick-walled when you count the double layer of 8 inch block and the fill in between. Expensive too. And, I am not convinced you will be able to get a watertight joint between the concrete pad and the block. The fill won't help a lot there either, since the area between the block walls is going to collect a lot of debris before you get a chance to pour it. Plus it will be a cold joint.

Now, with all that out of the way, the design of the pad and how the vertical rebar in the outer block wall is designed will have a lot to do with the ultimate strength of such a pool. Just pinning the vertical bar to the pad is not good enough. You need to have an engineer's design, and I bet it includes L-shaped bars with one leg in the pad.

The design is more than possible. I am not a registered engineer, so I can't design a structure for you, but I am an engineer, and I have designed many retaining walls for myself. The requirements for a retaining wall are higher than those for a swimming pool. The earth behind a retaining wall is presumed to act like a fluid with a density of 100 pounds/cubic foot. Water has a density of 62.4 pounds per cubic foot.

If you were willing to pour the walls I bet you could get by with 6" thickness, 8" for sure.

Of course you are going to need a deck around this pool so there is a graceful way to get out. Attachment points for the deck structure should be set into the concrete if you pour it, which will save you a fair amount of cost on the deck.
 
   / Need a Structural Engineer - Concrete Wall #5  
Bear: My biggest concern would be the "soil" compacting and footer work necessary. Your water will only weigh about 311 lbs/sqr ft, which does not impress me as being great. (I AM NOT AN ENGINEER.) I've driven a one-ton truck and into my garage (4" slab, only wire mesh) for 30 yrs, and that sure gives more than a 311 lb/sqr foot load. For two years, I've also driven in a 6100 lb loader. On my son's basement walls, we poured 12" foam blocks full (8" inside) w/ rebar reinforcement. Horizontally, every 2' had two, #4 rebar. Vertically, every 2' had one #4. The slab, poured first, had 24" of #4 rebar protruding every 16" into the wall. (This was info as per the foam block guy; standard procedure.) I'd BET that your water will exert no more force than what a basement is designed for; wet dirt, fuel trucks nearby, etc. Have you asked a concrete place? Surely they can advise at least about the floor, and I bet a 5" slab w/ mesh and rebar criss-crossed on 2' centers is gross overkill. What they say to do, do more; it is cheap.Good luck. j
 
   / Need a Structural Engineer - Concrete Wall #6  
PB, just dig a hole in the ground and be done with it or put an above ground pool in the ground, I think Timber did that?
:)
 
   / Need a Structural Engineer - Concrete Wall #7  
   / Need a Structural Engineer - Concrete Wall #8  
Mike-
You beat me to it but that was what I was going to recommend for the water seepage between wall and floor. Didn't realize how expensive it was. Would also recommend an above ground pool. The engineering is already done for you and the cost and maintence of concrete is getting to be out of this world.:eek: Know you want 5' and have seen a lot of models at 52" maybe an optional 5' liner is available. -Ed
 
   / Need a Structural Engineer - Concrete Wall #9  
I think I'd go for a monolithic pour walls and floor at the same time. :D :D

What is the reasoning behind the double block walls??:D :D
 
   / Need a Structural Engineer - Concrete Wall
  • Thread Starter
#10  
Wow, thanks for all the great info.

The double walls create the form for the monolithic pour.
Supposed to be a poor man's way to build a pool.
At least that was the design I saw back in 1977.

I saw this design for an inground pool in a book when I was 10 years old.
My Dad built an inground pool based on the design but he didn't use a
second wall of concrete blocks or the fill space between walls. He used
one wall of concrete blocks and went just over 5 feet on the shallow end
and just over 6 feet on the deep end. And didn't fill the centers of the
blocks. We couldn't fill it up all the way but we had fun in it for many years.
The new owners of that house had the pool filled in with a dozer.

I want to do an above ground version to match the height of our back deck.
My version will be the same depth all around. If I could find an above
ground pool that is the right depth I would do that instead.

Pooh Bear
 

Tractor & Equipment Auctions

2004 Komatsu wb 140 (A46683)
2004 Komatsu wb...
Adams 5-Ton Ground-Driven Fertilizer Spreader  Reliable & Field-Ready (A48561)
Adams 5-Ton...
3023 (A46502)
3023 (A46502)
2022 Mobark Eeger Beever 1215 Towable Woodchipper (A46683)
2022 Mobark Eeger...
2001 Bruno SRE-1550 Electra-Ride Stairway Elevator (A45336)
2001 Bruno...
2020 KENWORTH T800 TANDEM AXLE DAY CAB (A45678)
2020 KENWORTH T800...
 
Top