I am almost finished with the guardrails that I built at the entrance to the lane at the cabin property. I used the John Deere 790 to log the Rock (Chestnut) Oak and the FEL to carry the Oak beams to the bridge site. The oak is treated with copper napthanate that was recomended by the guys at the Forestry Forum.
The posts are 8" x 8" and the rails are 8" x 9" x 17' with 2" x 8" boards along the bottom. I still need to install the 2' x 8' uprights between the toeboards and the rails but they are cut and ready to install. There will be 7 uprights between the posts on approx 16" centers and I plan to finish it next week. I'll post the pictures of the finished guardrails soon.
 

Attachments

  • DSCN0899.JPG
    DSCN0899.JPG
    800.2 KB · Views: 170
  • DSCN0900.JPG
    DSCN0900.JPG
    785.9 KB · Views: 127
  • DSCN0911.JPG
    DSCN0911.JPG
    767.5 KB · Views: 208
  • DSCN0912.JPG
    DSCN0912.JPG
    869.4 KB · Views: 174
   / New Bridge Guardrail Project #2  
Wow, looks great!
 
   / New Bridge Guardrail Project #3  
Nice..real nice looking job!! :)
 

Tractor & Equipment Auctions

2015 Ford F550 Bucket Truck - Altec AT40M Boom - Powerstroke Diesel - Automatic Transmission - 4X4 (A55218)
2015 Ford F550...
VERMEER RTX 130 WALK BEHIND TRENCHER (A51242)
VERMEER RTX 130...
378812 (A51573)
378812 (A51573)
2019 VOLVO L70H WHEEL LOADER (A52706)
2019 VOLVO L70H...
2012 PETERBILT 388 DAYCAB (A53843)
2012 PETERBILT 388...
2017 POLARIS RANGER 570 4X4 PROSTAR UTV (A51406)
2017 POLARIS...
 
Top