Finished the back, fun cutting everything. But started with 293" and then 3" every section because it's a 1:12 roof and 1'=12" and 12/4=3 as it's 4 sections per 12' run. hard to explain but the math worked in my head AND on the garage. The we moved the scaffolding over to the middle and set the pump jacks up. I hate moving that scaffolding.