New Project - What Would You Have Done Differently?

   / New Project - What Would You Have Done Differently? #11  
Rory_Rhodes said:
So, now my question for the metal building;

What quick advice would you have - besides hiring a licensed electrician for the job - to plan this empty space out before I start moving equipment?

I will also have a Kubota L3130 w/backhoe, an RTV, and soon a SkidSteer to store in this unit.

My shop is much smaller but all my 110 Electric outlets are about 4 foot off the floor and there are two circuits for the outlets, every other outlet is on the alternate circuit, helps me keep from overloading a circuit with too many tools operating at the same time, the outlets are brown on one circuit, ivory on the other as a further reminder- the dust collector is on a separate 220V circuit. Good luck with the shop, would love to have that kind of space!
 

Tractor & Equipment Auctions

2010 Ford Edge SE SUV (A51694)
2010 Ford Edge SE...
(INOP) VOLVO L70H WHEEL LOADER (A51243)
(INOP) VOLVO L70H...
2021 KENWORTH T270 (A55745)
2021 KENWORTH T270...
2002 VOLVO L150E WHEEL LOADER (A51246)
2002 VOLVO L150E...
2009 GMC C5500 Landscape Dump Truck (A55788)
2009 GMC C5500...
New Kivel 3500 lb. Skidloader Forks (A50775)
New Kivel 3500 lb...
 
Top