New Project - What Would You Have Done Differently?

   / New Project - What Would You Have Done Differently? #11  
Rory_Rhodes said:
So, now my question for the metal building;

What quick advice would you have - besides hiring a licensed electrician for the job - to plan this empty space out before I start moving equipment?

I will also have a Kubota L3130 w/backhoe, an RTV, and soon a SkidSteer to store in this unit.

My shop is much smaller but all my 110 Electric outlets are about 4 foot off the floor and there are two circuits for the outlets, every other outlet is on the alternate circuit, helps me keep from overloading a circuit with too many tools operating at the same time, the outlets are brown on one circuit, ivory on the other as a further reminder- the dust collector is on a separate 220V circuit. Good luck with the shop, would love to have that kind of space!
 

Tractor & Equipment Auctions

2014 Ford Taurus AWD Sedan (A54815)
2014 Ford Taurus...
2016 CATERPILLAR 336FL EXCAVATOR (A52705)
2016 CATERPILLAR...
2000 Freightliner FL70 Manitex 14 Ton Crane Truck (A55788)
2000 Freightliner...
2018 JLG 2632ES 26ft Electric Scissor Lift (A55787)
2018 JLG 2632ES...
2017 Ford Explorer SUV (A55758)
2017 Ford Explorer...
MODERN AG PREDATOR 15 15' BATWING MOWER (A51406)
MODERN AG PREDATOR...
 
Top