New Project - What Would You Have Done Differently?

   / New Project - What Would You Have Done Differently? #11  
Rory_Rhodes said:
So, now my question for the metal building;

What quick advice would you have - besides hiring a licensed electrician for the job - to plan this empty space out before I start moving equipment?

I will also have a Kubota L3130 w/backhoe, an RTV, and soon a SkidSteer to store in this unit.

My shop is much smaller but all my 110 Electric outlets are about 4 foot off the floor and there are two circuits for the outlets, every other outlet is on the alternate circuit, helps me keep from overloading a circuit with too many tools operating at the same time, the outlets are brown on one circuit, ivory on the other as a further reminder- the dust collector is on a separate 220V circuit. Good luck with the shop, would love to have that kind of space!
 

Tractor & Equipment Auctions

IH 686 Tractor (A50514)
IH 686 Tractor...
2010 Ford Edge SE SUV (A51694)
2010 Ford Edge SE...
Heritage / Woods RD 72 3 pt Finish Mower (A50515)
Heritage / Woods...
Texas Post Driver Series 500 Heavy-duty Hydraulic Post Driver (A52128)
Texas Post Driver...
1989 Freightliner FLD120 (NEW CAT 3406A, NEW REAR ENDS, CLUTCH) (A50397)
1989 Freightliner...
Kewanee 15' Disk (A50515)
Kewanee 15' Disk...
 
Top