M
mperkins
Guest
Hello all - I've been lurking on the board for a while now and finally jumped into the pool. I now have a B2400, 660 hours, with FEL, box scraper, PHD, 4' rotary cutter, and a beat-up landscape rake. spent the weekend of the fourth putting everything through its paces. The PHD is great for planting bushes - sure beats hand digging in our clay up here.
It is a little beat around the edges, and the top edge of the bucket was bent down - the previous owner had a little run-in with an excavator, but I was able to straighten it out with some 4x4 and a three ton floor jack. First modification was a bucket level indicator - 1/2" cpvc pipe, a fitting, and some 3/8" steel rod I had lying around. I'll see about posting some pix if there is any interest.
-Mac
It is a little beat around the edges, and the top edge of the bucket was bent down - the previous owner had a little run-in with an excavator, but I was able to straighten it out with some 4x4 and a three ton floor jack. First modification was a bucket level indicator - 1/2" cpvc pipe, a fitting, and some 3/8" steel rod I had lying around. I'll see about posting some pix if there is any interest.
-Mac