tractchores said:What's the orange layer? Stone dust? How did you get it so nice and level? I've got 2 big walkways with natural stone to redo shortly, thinking its a rip and replace job and want to do it right the first time. Speaking of wives mine yesterday claimed that I need "approval" from her for my next project, seems she thinks I'm going to kill myself with all these tractor related projects!
I laid down 3/4 gravel for the base, followed by 3-4 inches of limestone screenings packed down, then a top layer of sand. I got a 1/2 ton bag of masonry sand from Lowes...laid down 2 lengths of 1" PVC, and laid a 2x4 down to screed the sand level...once the prep was done the lay out of the bricks went quick.