New WorkShop

   / New WorkShop #1  

warburtonplayer

Silver Member
Joined
Jun 9, 2007
Messages
127
I just wanted to get some thoughts about my new building. I plan on setting 6 6x6's for a 16x16 shop. Once the post are set I was just going to frame up the bottom of the post with 2x6's and poor concrete for the floor. Has anyone had any experience doing it this way? I have ordered the trusses which only cost $413 not too bad. I will frame up the top of the 6x6's with 2x6's and notch the top of the post and bolt the 2x6's up. If anyone has any ideas please let me know.
 
   / New WorkShop #2  
I am not sure on that. Hopefully others will chime in. But please keep us posted, pics too please.

:)
 
   / New WorkShop
  • Thread Starter
#3  
Forgot to mention that I will be using treated post with tar on the end of them.
 
   / New WorkShop #4  
6-6x6 is not enough if 8' centers.Would take 9 unless you have 16' door.
you might use treated on bottom 2x6.I also poured my floor after it was framed.Double 2x6 on top is probably OK. 2x8 better.Good luck on your shop.Framer
 

Tractor & Equipment Auctions

2025 SDLANCH SDLD25 UNUSED Crawler Dumper (A53117)
2025 SDLANCH...
2016 FREIGHTLINER CASCADIA TANDEM AXLE SLEEPER (A53426)
2016 FREIGHTLINER...
JOHN DEERE 6615 TRACTOR (A51406)
JOHN DEERE 6615...
2014 DRAGON PRODUCTS 130BBL VACUUM TRAILER (A53843)
2014 DRAGON...
2018 Chevrolet Camaro 1LT Coupe (A51694)
2018 Chevrolet...
2025 IR UNUSED Cleanout Bucket (A53117)
2025 IR UNUSED...
 
Top