KubotaSteve
Platinum Member
- Joined
- Dec 4, 2003
- Messages
- 834
- Location
- eastern panhandle of WV
- Tractor
- Kubota B7800 with loaded R-4s
I had my house built about 4 years ago and the panel box was completely full except for 2 blanks. The basement was not even finished. When finishing the basement, I had to end up getting the slimline breakers to have enough room. I am going to be putting up a garage in the near future and was wondering if I could just stick say a 50 or 100 amp breaker in and run it out to the garage and have a small panel box there and then run the smaller lines from there.
Also I currently have 200 amp service, what determines when you need to increase your service? The main power things in the house is the heatpump/AC which is a 4 ton unit, the electric stove, well pump, hot water heater, electric dryer, fridge, freezer. Other than those, its just your basic electricity needs.
Also I currently have 200 amp service, what determines when you need to increase your service? The main power things in the house is the heatpump/AC which is a 4 ton unit, the electric stove, well pump, hot water heater, electric dryer, fridge, freezer. Other than those, its just your basic electricity needs.