Pat's Easy Change Ordered

   / Pat's Easy Change Ordered #1  

RSKY

Elite Member
Joined
Oct 5, 2003
Messages
2,728
Location
Kentucky, West of the Lakes, South of Possum Trot.
Tractor
Kioti CK20S
Finally ordered my Pat's Easy Change. Shopped online and found the best price to be from Rural King. Easy Change with spreader bar and three extra sets of washers was $181.96 plus $10.92 tax for a total of $192.88. No shipping charge! It has already shipped and should be here tomorrow or Monday. I will let everybody know how ordering from Rural King works out.

RSKY
 
   / Pat's Easy Change Ordered #2  
Just started using mine.
So far, so good.....and makes hooking up so easy.

One learning curve: My post hole digger (PHD) is Cat 1 (can't change welded pins) and the PAT's are CAT 2. No problem says I, just add a conversion bushing to the PHD pins, now they're Cat 2 and off I went.
The PHD in rocky ground(!) was a good test for Pats.... BUT I forgot and used the CAT 2 "special 1/2 washers" that came with the Pat's, that protect the retaining clip that goes through the PHD's pins. What I didn't notice is there's just enough slop in those washers on the Cat 1 pin that when the PHD finds a rock and bangs around, the washer can sneak past the bottom of the retaining clip and unlock the clip and send it flying. :eek: Now I'm watching a rotating post hole digger banging around in a hole & it's only hanging to the tractor is by the top link and the PTO. This 1 point hitch doesn't work well!

I went and bought some "full circle" washers with a 7/8" opening (Cat 1) and used them and no problems.
 
   / Pat's Easy Change Ordered #3  
Finally ordered my Pat's Easy Change. Shopped online and found the best price to be from Rural King. Easy Change with spreader bar and three extra sets of washers was $181.96 plus $10.92 tax for a total of $192.88. No shipping charge! It has already shipped and should be here tomorrow or Monday. I will let everybody know how ordering from Rural King works out.

RSKY
Pat's Easy Change is $169.99 from Agri Supply.
No Tax,..... but there is a shipping cost.
Agri Supply is a FIRST CLASS COMPANY to deal with!
 
   / Pat's Easy Change Ordered #4  
I have a set of Pat's QH, but I have been using my H.F. Q.H. for so long, I decided to go back to that. I have the Pat's on Craig'sList for $125. No bites yet. I should use Ebay, but I hate the monthly fee they charge.
 
   / Pat's Easy Change Ordered #5  
Do yourself a favor and buy some grade 8 bolts to replace the ones they ship with, they are super cheap and can bend. mine bent and they shipped me gold color grade 8 which are so much stronger. The manufacturer has awesome customer service but using a stronger bolt would prevent things. The easy change system rocks.
 
   / Pat's Easy Change Ordered #6  
I have a set of Pat's QH, but I have been using my H.F. Q.H. for so long, I decided to go back to that. I have the Pat's on Craig'sList for $125. No bites yet. I should use Ebay, but I hate the monthly fee they charge.

Since when has E-Bay been charging a "monthly fee"?
 
   / Pat's Easy Change Ordered #7  
Do yourself a favor and buy some grade 8 bolts to replace the ones they ship with, they are super cheap and can bend. mine bent and they shipped me gold color grade 8 which are so much stronger. The manufacturer has awesome customer service but using a stronger bolt would prevent things. The easy change system rocks.

Grade 5 bolts should work just fine also.
 
   / Pat's Easy Change Ordered
  • Thread Starter
#8  
Pat's Easy Change is $169.99 from Agri Supply.
No Tax,..... but there is a shipping cost.
Agri Supply is a FIRST CLASS COMPANY to deal with!

The Rural King total delivered was $192.88. Agri Supply did not have free shipping. When all was totaled up they would have been $204.77. Or nearly twelve dollars higher for the same thing. So I went with Rural King.

RSKY
 
   / Pat's Easy Change Ordered #9  
Mine worked fine with a bush hog planter, disc, tiller etc but didn't work well with a box blade that's when the bolts bent. Just a suggestion
 
   / Pat's Easy Change Ordered #10  
Do yourself a favor and buy some grade 8 bolts to replace the ones they ship with, they are super cheap and can bend. mine bent and they shipped me gold color grade 8 which are so much stronger. The manufacturer has awesome customer service but using a stronger bolt would prevent things. The easy change system rocks.
I'm not very familiar with Pat's easy change system but one might be careful not to use too strong a bolt causing a more expensive failure if it doesn't bend/shear.
 
 

Tractor & Equipment Auctions

2007 PETERBILT 379 TANDEM AXLE SLEEPER TRUCK (A53426)
2007 PETERBILT 379...
2014 Chevrolet Express 3500 Cargo Van (A55852)
2014 Chevrolet...
2014 Ford Fusion SE Sedan (A53424)
2014 Ford Fusion...
2022 Chevrolet Tahoe FL SUV (A51694)
2022 Chevrolet...
TROYBILT TB685 EC WEEDEATER (A54757)
TROYBILT TB685 EC...
2010 LAREDO 5TH WHEEL (A55745)
2010 LAREDO 5TH...
 
Top