Pat's Easy Change Ordered

   / Pat's Easy Change Ordered #11  
I'm not very familiar with Pat's easy change system but one might be careful not to use too strong a bolt causing a more expensive failure if it doesn't bend/shear.

The other damage that would occur would be that it strips the threads out of the Pat's hitches. Then I guess it would be time for larger bolts.
 
   / Pat's Easy Change Ordered #12  
Pat's Easy Change is $169.99 from Agri Supply.
No Tax,..... but there is a shipping cost.
Agri Supply is a FIRST CLASS COMPANY to deal with!

That's where I got mine. They include the drag link in the price where some other suppliers charge you about $18 more for it. Without the link you loose half the advantage of the system.
 
   / Pat's Easy Change Ordered #13  
That's where I got mine. They include the drag link in the price where some other suppliers charge you about $18 more for it. Without the link you loose half the advantage of the system.

Unless you have telescoping stabilizers.
 
 

Tractor & Equipment Auctions

2006 CHEVROLET SILVERADO 4X4 PICKUP TRUCK (A52141)
2006 CHEVROLET...
2004 INTERNATIONAL DURASTAR 4300 BOX TRUCK (A55745)
2004 INTERNATIONAL...
Deere 35G (A53317)
Deere 35G (A53317)
2003 International 4300 Cab and Chassis Truck (A55852)
2003 International...
2010 Ford Edge SE SUV (A51694)
2010 Ford Edge SE...
2015 MACK CHU (PINNACLE) TRI AXLE(INOPERABLE) (A55745)
2015 MACK CHU...
 
Top