I've got the plans done, but need some info.
I have my area leveled and it's been that way through all the rain we've had this spring. Its Indiana clay and 99% of the area drains pretty quick when the rain stops. Usually within 24 hours it's dry on top and can run a 7000lb tractor over it and barely leave and marks.
I plan on putting a base of gravel, then plastic, then foam insulation, pex and rebar, and finally 5" of cement.
My main question is how much gravel do I need to put down for the base. I'm guessing 4"-6" before I pack it.
Wedge
I have my area leveled and it's been that way through all the rain we've had this spring. Its Indiana clay and 99% of the area drains pretty quick when the rain stops. Usually within 24 hours it's dry on top and can run a 7000lb tractor over it and barely leave and marks.
I plan on putting a base of gravel, then plastic, then foam insulation, pex and rebar, and finally 5" of cement.
My main question is how much gravel do I need to put down for the base. I'm guessing 4"-6" before I pack it.
Wedge