I've got the plans done, but need some info.
I have my area leveled and it's been that way through all the rain we've had this spring. Its Indiana clay and 99% of the area drains pretty quick when the rain stops. Usually within 24 hours it's dry on top and can run a 7000lb tractor over it and barely leave and marks.
I plan on putting a base of gravel, then plastic, then foam insulation, pex and rebar, and finally 5" of cement.

My main question is how much gravel do I need to put down for the base. I'm guessing 4"-6" before I pack it.


Wedge
 
/ Pole barn base? #2  
Provided you have good drainage, seems like way overkill on the gravel. You have a great base already with the packed and seasoned clay. In my region (midwest) most guys would put down enough gravel or sand to just get everything level and uniform. Then pack/roll the gravel/sand smooth and firm.
 

Marketplace Items

2014 Doyle Dry Fertilizer Tender Trailer - Kubota Diesel, 3 Stainless Compartments, Side Discharge (A61307)
2014 Doyle Dry...
2010 Sauber 25' Tag Trailer (A62613)
2010 Sauber 25'...
500BBL WHEELED FRAC TANK (A58214)
500BBL WHEELED...
GEARMATIC WINCH (A58214)
GEARMATIC WINCH...
2025 Pabreak 6-Way 84in. Serrated Hydraulic Dozer Blade Skid Steer Attachment (A61567)
2025 Pabreak 6-Way...
2017 DRAGON 150 BBL ALUMINUM VACUUM TRAILER (A60736)
2017 DRAGON 150...
 
Top