Larry Caldwell
Super Member
When you backfill over the drain lines, avoid pea gravel. It will quickly plug with sediment. Use 2" washed drain rock, like they use in septic systems. Your contractor may be right about the retaining wall interrupting surface runoff. One drain on the uphill side of the retaining wall and a second on the downhill side, plus gutters if practicable.