ponds

   / ponds #11  
I had an acre to acre and a half pond dug 2 years ago. It took a 14-yard scraper pulled by a 240 HP dually John Deere tractor, a D6, and a road grader 8 days to dig it and spread the spoils for a housepad.

I our clay soil it would take about 1000 years to do it with my B2710.
 

Tractor & Equipment Auctions

4- 6 DRILL COLLARS (A50854)
4- 6 DRILL COLLARS...
1240 (A50490)
1240 (A50490)
2018 Skyjack SJ1056TH 10,000lb 4x4 Rough Terrain Telehandler (A49461)
2018 Skyjack...
71056 (A49346)
71056 (A49346)
24 Foot Wells Cargo Enclosed Trailer (A50324)
24 Foot Wells...
2014 Freightliner Ambulance (A50323)
2014 Freightliner...
 
Top