Post Hole Digger Build Blues

   / Post Hole Digger Build Blues #11  
Here is your ideal setup for the auger. Just plug your PTO hoses into this valve and you will have fwd/rev, and three position detent. This valve will let you concentrate on driving the auger down, using the FEL valve.


https://www.surpluscenter.com/item.asp?item=9-6767&catname=hydraulic

However if you wanted variable speed control only in the fwd direction, then this valve would be ideal.

https://www.surpluscenter.com/item.asp?item=9-4169-10&catname=hydraulic

This one is 0 to 16 GPM's, and the next size at Surplus is 0 to 30.

Tractor PHD with a hyd motors actually do reverse.
 
   / Post Hole Digger Build Blues
  • Thread Starter
#12  
Right now the wife is pissed about being $200 over budget. Once I get the gate in then I can ask for more toys.

This said, JJ, where would you mount all of this stuff? I hate to say it but realestate on the PT is at a premium for sure.
 
   / Post Hole Digger Build Blues #13  
My PTO speed control hyd valve is on the right side of the tunnel.

If using the detent valve, I would bolt it to the front face of the PT, and use some short hoses to feed the detent valve, then, plug the auger into the detent valve. Then when you want to use the auger, just reach over and set it to detent, and then flip the switch for the PTO when ready.

Have you ever counted all those shoes and purses some of the women have, and they want to complain about a little hold out money. Just send that one credit card bill to the office. Just don't let her clean up the office.
 
   / Post Hole Digger Build Blues #14  
Carl,

Post a good close up picture of the front of your PT.

The valve could actually be on the auger frame. Set the valve the way you want, after that, the PTO switch does the rest.
 
   / Post Hole Digger Build Blues
  • Thread Starter
#15  
JJ

Brilliant idea. Do you have a link to an electrically switched directional control? 18GPM. 3000 PSI
 
   / Post Hole Digger Build Blues #16  
   / Post Hole Digger Build Blues
  • Thread Starter
#17  
   / Post Hole Digger Build Blues #18  
Using the solenoid valve I posted above, You would wire the solenoid motor control switch like this. The 12 v from your PTO switch would feed the the center of a three position switch. Terminal 1 feeds the voltage for fwd position. Terminal 2 is the 12 v input. Terminal 3 feeds the voltage for rev. The solenoids would have a common ground.
 

Tractor & Equipment Auctions

2012 Ram 1500 4x4 Crew Cab Pickup Truck (A49461)
2012 Ram 1500 4x4...
TOOLBOX/FUEL TANK COMBO (A50854)
TOOLBOX/FUEL TANK...
1994 Peterbilt 379 Semi (A50514)
1994 Peterbilt 379...
2019 BIG TEX GOOSENECK  TRI AXLE 34FT 2 CAR HAULER (A51222)
2019 BIG TEX...
2003 Big Tex 10PI 16ft. T/A Pipe Top Utility Trailer (A49461)
2003 Big Tex 10PI...
John Deere 5090E Tractor with Loader Prep Package, 2 Rear Remotes, Warranty Until 2028 (A51039)
John Deere 5090E...
 
Top