</font><font color="blue" class="small">( I put it on concrete piers formed by using sonotubes. I put a 12 inch diameter pad 6 inches thick and 2 feet underground for the footing, and when that dried, I poured 6 inch diameter piers using the sonotubes. Everything was tied together with rebar. )</font>
TNhobbyfarmer:
I assume you didn't need enough concrete to have a truck deliver it. Did you mix the concrete yourself? Electric or gas mixer? Easy project?
TNhobbyfarmer:
I assume you didn't need enough concrete to have a truck deliver it. Did you mix the concrete yourself? Electric or gas mixer? Easy project?