putting green

   / putting green #1  

newtractorowner

New member
Joined
Mar 14, 2001
Messages
6
does anyone know how to construct a putting green? I have an area about 35' in diameter scraped down to the hard pan clay. I wonder if I can just put top soil over the top of the clay. How much slope to the hole? Any help would be great.

Thanks
 
   / putting green #2  
A friend of mine worked on a grounds crew, and we discussed this topic a few years ago.
Once you have a compact, graded surface (your clay), dump approximately 6-8 inches of #2 stone, which is then topped with quarry dust and packed down firm. This apparently provides a stable, yet porous base, allowing your topsoil to drain.
According to my buddy, this is where you will shape the surface of your green, by providing the undulations/breaks, etc.
You will then top your green with 10 inches of the finest topsoil that you can afford. There are a number of varieties of grass that work well in different areas of the country.
For drainage, remember: the slope of the clay should reflect where you want the water to drain. Good luck.
 
   / putting green #3  
   / putting green #4  
newtractorowner,
Check with Murf over on the Compact Tractor Board. His company builds golf courses in Canada and the northern U.S. http://www.jplan.com

18-32460-1250sig.gif
 

Tractor & Equipment Auctions

UNUSED WOLVERINE TL-12-72W 72" HYD TILLER (A54757)
UNUSED WOLVERINE...
2013 CATERPILLAR 312E EXCAVATOR (A51406)
2013 CATERPILLAR...
2835 (A54757)
2835 (A54757)
EXCAVATOR GRAPPLE (A53843)
EXCAVATOR GRAPPLE...
UNUSED LANDHONOR LHR-LB9510 GAS LEAF BLOWER (A54757)
UNUSED LANDHONOR...
2001 New Holland EC215 Hydraulic Excavator (A52377)
2001 New Holland...
 
Top