Rail roads and their tracks.

   / Rail roads and their tracks. #3,191  
I've read the diesels that accompany these exhibition trains aren't needed for horsepower.

The helper diesels are needed for modern requirements re signalling, electricity generation that matches passenger cars behind, (there are several 'standards') and most important, engine braking and reliable air for train braking.
I talked with a crew member on a B&O (?) excursion in North Judson IN, about the diesels. He told me they used the engine braking to give the locomotive something to "pull against" for a better show. Sounded legit to me.
103_0306.JPG
103_0308.JPG
103_0321.JPG
103_0307.JPG
103_0320.JPG
 
   / Rail roads and their tracks. #3,192  
A BNSF switch crew ran into a hiccup today while switching the General Mills elevators on Rice's Point in Duluth MN. Wednesday, 11/8/23. Thanks for keeping this thread about RR's.View attachment 831173
What happened? Soft ground? Rail folded over? Ran off the end of the track? 2607 pushed it too hard against an immovable line of cars? ???
 
   / Rail roads and their tracks. #3,193  
What happened? Soft ground? Rail folded over? Ran off the end of the track? 2607 pushed it too hard against an immovable line of cars? ???
Flat tire.

:D

Bruce
 
   / Rail roads and their tracks. #3,195  
Looks like the rail on the closer side has a kink/sank.
 
   / Rail roads and their tracks. #3,196  
Road engines used on light rail and neglected road beds way to much HP there to switch an industry
When I was working road power was often restricted on an industrial siding for that reason
 
   / Rail roads and their tracks.
  • Thread Starter
#3,197  
Road engines used on light rail and neglected road beds way to much HP there to switch an industry
When I was working road power was often restricted on an industrial siding for that reason
I thought those were lighter swtich engines. I see they have 2 axle trucks.
 
   / Rail roads and their tracks. #3,198  
A very quick search shows a classic SW-7 switcher as 248,000lbs, and a light road switcher GP38-2 as 250,000lbs. But many industries have their own much lighter industrial switchers.

Bruce
 
   / Rail roads and their tracks. #3,199  
Good OL Amtrak, canceled my wife's train this morning, 30 minutes before departure. Has to take a bus 2 hours later and get home 2 hours late.
 
   / Rail roads and their tracks. #3,200  
Good OL Amtrak, canceled my wife's train this morning, 30 minutes before departure. Has to take a bus 2 hours later and get home 2 hours late.
Guess all those subsidies don’t do much to help.
 

Tractor & Equipment Auctions

2015 Ford F-250 4x4 Ext. Cab Pickup Truck (A46684)
2015 Ford F-250...
2023 New Holland C332 Two Speed Compact Track Loader Skid Steer (A45336)
2023 New Holland...
2016 Toro Reelmaster 3100D 72in Reel Mower (A46684)
2016 Toro...
Power Screen HX5000 (A45336)
Power Screen...
JCB E0586 Rough Terrain Forklift (A45336)
JCB E0586 Rough...
2012 WESTERN STAR 4900 (A45046)
2012 WESTERN STAR...
 
Top