tvman
Bronze Member
Need some advice on re-plumbing my 3rd function valve. My current set up is the typical electric solenoid and a DO-5? plate which is fed from my power beyond.
My tractor also has a BH circuit, it seems that the hydraulic hose is 1/2" in and out of the DO-5 plate.
I would like to replace this short section of 1/2" hose with 1/4" hose. If I do this will it create a problem wit lack of flow to the BH?
	
		
			
		
		
	
				
			My tractor also has a BH circuit, it seems that the hydraulic hose is 1/2" in and out of the DO-5 plate.
I would like to replace this short section of 1/2" hose with 1/4" hose. If I do this will it create a problem wit lack of flow to the BH?
 
 