Roads

   / Roads #11  
This is the D9 approaching the ravine. gives you a perspective of the magnitude of the task.
 

Attachments

  • 887646-DOZER AT START OF RAVINE.JPG
    887646-DOZER AT START OF RAVINE.JPG
    84.6 KB · Views: 266
   / Roads #13  
Once he got to the bottom, he had to build it up some first before continuing. Here he is starting to cut the other side.
 

Attachments

  • 887649-DOZER ON FAR BANK OF RAVINE.JPG
    887649-DOZER ON FAR BANK OF RAVINE.JPG
    87.1 KB · Views: 244
   / Roads #15  
I'm having road work done right now. I paid $120 an hour for the dozer work. We are cutting 600' of new road and smooth out approx. 1200' of an exising road (hardly a road...just wheel tracks...) Still don't know exactly what it will cost me yet.
 
   / Roads #16  
I'm having road work done right now. I paid $120 an hour for the dozer work. We are cutting 600' of new road and smooth out approx. 1200' of an exising road (hardly a road...just wheel tracks...) Still don't know exactly what it will cost me yet.
 
   / Roads #19  
I'm confused on what your using for your road. Is that the price for 4 inches of gravel to be put down with nothing on top?

Limestone gravel in my area of East Texas is $14 a ton a few months ago. I'm sure the price of fuel has increased that some. A full load on a belly dump has about 26 tones on it and will give me 4 plus inches of material ten feet wide for close to a hundred feet.

That's $364 per load. For 12 foot wide and inflation, I'd say $450 is a safe working number.

Do that for 2,700 feet and you are looking at $12,150 in rock.

Are you sure that price was for square feet and not liniear feet? Your looking at another $20,000 in labor.

Eddie
 
   / Roads #20  
I'm confused on what your using for your road. Is that the price for 4 inches of gravel to be put down with nothing on top?

Limestone gravel in my area of East Texas is $14 a ton a few months ago. I'm sure the price of fuel has increased that some. A full load on a belly dump has about 26 tones on it and will give me 4 plus inches of material ten feet wide for close to a hundred feet.

That's $364 per load. For 12 foot wide and inflation, I'd say $450 is a safe working number.

Do that for 2,700 feet and you are looking at $12,150 in rock.

Are you sure that price was for square feet and not liniear feet? Your looking at another $20,000 in labor.

Eddie
 

Tractor & Equipment Auctions

PENDING SELLER CONFIRMATIONS (A54313)
PENDING SELLER...
UNUSED LANDHONOR MPF-11-2000G PALLET FORKS FRAME (A54757)
UNUSED LANDHONOR...
2019 Allmand Night-Lite V-Series 7kW S/A Towable Light Tower (A52377)
2019 Allmand...
UNUSED KIVEL 3500# PALLET FORKS (A54757)
UNUSED KIVEL 3500#...
2840 (A54757)
2840 (A54757)
2019 FREIGHTLINER CORONADO MIDROOF SLEEPER (A54607)
2019 FREIGHTLINER...
 
Top