Here is a project I worked on this afternoon, I have already installed a new pipeline for irrigation and need to laser level this field.

So I started tilling at 3:45 pm and ended at 6:50 pm. This included a few minutes for a break and refueling, so 4.2 acres in 3 hours. Travel speed was 2.6 mph and the tiller blades are worn but still good enough for the initial passes.

Notice how tall the grass and weeds are because I had no issues with wrapping, higher than the tractor hood in places. Next week I will make another pass
 

Attachments

  • 20170822_190119.jpg
    20170822_190119.jpg
    4.2 MB · Views: 128
  • 20170822_190115.jpg
    20170822_190115.jpg
    4.3 MB · Views: 114
  • 20170822_173820.jpg
    20170822_173820.jpg
    6 MB · Views: 127
   / Rototilling #22  
I would charge by the hour. $75-$100 is about right. Let the customer decide when it looks like what they want. No danger in underbidding the job if you set the hourly rate right.
 

Tractor & Equipment Auctions

Honda EM3500S Portable Gasoline Generator (A59228)
Honda EM3500S...
2019 CATERPILLAR D6 HIGH TRACK CRAWLER DOZER (A60429)
2019 CATERPILLAR...
2012 JACK COUNTY TANK 130 BBL STEEL (A58214)
2012 JACK COUNTY...
ALLMAND NIGHT-LIGHT PRO 4 BULB LIGHT PLANT (A52706)
ALLMAND...
Toyota 8BPU15 3,000 LB Stand-On Electric Forklift (A59228)
Toyota 8BPU15...
2022 Schulte SMR-800 Multi Rake Landscape Windrower (A56438)
2022 Schulte...
 
Top