Here is a project I worked on this afternoon, I have already installed a new pipeline for irrigation and need to laser level this field.

So I started tilling at 3:45 pm and ended at 6:50 pm. This included a few minutes for a break and refueling, so 4.2 acres in 3 hours. Travel speed was 2.6 mph and the tiller blades are worn but still good enough for the initial passes.

Notice how tall the grass and weeds are because I had no issues with wrapping, higher than the tractor hood in places. Next week I will make another pass
 

Attachments

  • 20170822_190119.jpg
    20170822_190119.jpg
    4.2 MB · Views: 125
  • 20170822_190115.jpg
    20170822_190115.jpg
    4.3 MB · Views: 111
  • 20170822_173820.jpg
    20170822_173820.jpg
    6 MB · Views: 123
   / Rototilling #22  
I would charge by the hour. $75-$100 is about right. Let the customer decide when it looks like what they want. No danger in underbidding the job if you set the hourly rate right.
 

Tractor & Equipment Auctions

LINCOLN ELECTRIC RANGER 225 GAS WELDER/GENERATOR (A54757)
LINCOLN ELECTRIC...
1998 BOMAG BW172D-2 SMOOTH DRUM ROLLER (A52707)
1998 BOMAG...
2015 Chevrolet Tahoe SUV (A55853)
2015 Chevrolet...
2018 LARK UNITED MANUFACTURING S/A GUARD SHACK (A55745)
2018 LARK UNITED...
2010 Ford Edge SE SUV (A51694)
2010 Ford Edge SE...
2010 Toro Workman MD (A55973)
2010 Toro Workman...
 
Top