Ok, here is my mistake for the weekend project, I think.
I had a small whole dug, 24 by 20 and 14in deep. It was for a small mail box on which will be made of brick only 24 inches high and 10 inch wide more or less.
I bought three bags of concrete mix and half way through the pour and mixing I figured out it was not going to be enough. The stores were closed. I had two bags of mortar mix that I used and put in ½ inch stone (note sure about the amount maybe 1/3). I used my tractor bucket as a mixing bowel keeping the concrete and mortar apart while mixing. Then kind of mix 1/3 mortar to 2/3 concrete cement and the extra ½ inch stone. This filled up the whole nicely and I was able to strike it smooth.
My question is how much did I weaken the pour and will it hold up. Any idea folks.
Thanks
Roger
I had a small whole dug, 24 by 20 and 14in deep. It was for a small mail box on which will be made of brick only 24 inches high and 10 inch wide more or less.
I bought three bags of concrete mix and half way through the pour and mixing I figured out it was not going to be enough. The stores were closed. I had two bags of mortar mix that I used and put in ½ inch stone (note sure about the amount maybe 1/3). I used my tractor bucket as a mixing bowel keeping the concrete and mortar apart while mixing. Then kind of mix 1/3 mortar to 2/3 concrete cement and the extra ½ inch stone. This filled up the whole nicely and I was able to strike it smooth.
My question is how much did I weaken the pour and will it hold up. Any idea folks.
Thanks
Roger