Solar is complete

   / Solar is complete #1  

LD1

Epic Contributor
Joined
Apr 30, 2008
Messages
22,534
Location
Central Ohio
Tractor
Kubota MX5100
Finally got everything done with solar....so time to dump some pics.

Site prep was challenging.... hillside....

The racking is Sinclair sky-rack 2.0 seasonal adjust. They spec'd a 7' deep hole 24" in diameter. Had to make an auger extension for that.

Panels are Canadian solar 540w bifacial

Inverters are hoymiles hms-2000. Each inverter connects 4 panels

Site prep:
IMG_20240830_180624853_MP.jpg
IMG_20240830_180718543.jpg
 
   / Solar is complete
  • Thread Starter
#4  
Test fitting 4 panels. This was Tuesday this week. Needed to see how/where I am gonna mount the inverters.....to see what if any extended cables I need to connect the panels.

Good news is that none were needed.
IMG_20240910_095054605_MP.jpg
IMG_20240910_095102984_MP.jpg
IMG_20240910_095123951_MP.jpg
 
   / Solar is complete
  • Thread Starter
#5  
Spent most of the day yesterday working on the wiring of the inverters.

The premade trunk lines from hoymiles is good for inverter to inverter.....but can only run 3 inverters per trunk. (8a inverter output....10ga wire)

So then it becomes a lengthy run back to the collector box. So I bought a spool of wire for those home-runs

IMG_20240911_131932880_MP.jpg
IMG_20240911_131939081_MP.jpg
IMG_20240911_134722396_MP.jpg
IMG_20240911_134740372_MP.jpg
 
   / Solar is complete
  • Thread Starter
#6  
So by the time I got all the inverters mounted and wired....I flipped the switch for those 4 panels at about 3:00.

Then I started setting up the DTU to communicate. I was worried about it's range. But so far the DTU seems to communicate well....even at ~300' away and through an exterior wall. Sub 1g does seem to have good range.

By about 4:00 it was all set up and logging. 4-panels making power

Screenshot_20240911-160207.png
 
   / Solar is complete #7  
Looking good. What are you going to power? Is it grid tie or battery? How many inverters total?
 
   / Solar is complete #8  
Good job! Were you able to get any subsidies from the government (fed and state)?
Can you sell power back to your provider?
total cost for installation?
 
   / Solar is complete
  • Thread Starter
#9  
Last night I mounted the rest of the panels. Had to wait on some extra hands to get off work to assist.

All 30 panels are mounted...but only 28 are hooked up.

I had 2 panels that were actually from a different batch/pallet and the mc4 leads are super short. So I have extender cables on the way

1726093058183.jpg
1726096316075.jpg
 
   / Solar is complete #10  
Are you going to have 5 people on each crank hand cranking them to adjust the angle?
 

Tractor & Equipment Auctions

2008 International 4400 Terex Hi-Ranger HRX-55 Material Handling Insulated Bucket Truck (A44571)
2008 International...
2025 Wolverine TL-12-72W Hydraulic Rotary Tiller (A47484)
2025 Wolverine...
2025 Wolverine PFF3-13-45W Pallet Fork Frame (A47484)
2025 Wolverine...
2025 AllMetal K1912 UNUSED Livestock Metal Shed (A47484)
2025 AllMetal...
Miscellaneous Electronics (A47484)
Miscellaneous...
2025 Wolverine ADB-13-1218R Auger Attachment (A47484)
2025 Wolverine...
 
Top