Top and TIlt, additional stress on 3pt attach pts?

   / Top and TIlt, additional stress on 3pt attach pts?
  • Thread Starter
#21  
Just an update...
Got the top and tilt. Have put another 30-40 hours using the box blade and the repair has held up so far.

My dealer said when he saw the repair "I have seen some repairs like that last 20 minutes and some that last 20 years"

He also mentioned that the casting is around 420 plus another 200-350 in labor.

For now I keep running with it and hope for the 20 years.
 

Tractor & Equipment Auctions

2014 Ford F-150 Ext. Cab Pickup Truck (A50323)
2014 Ford F-150...
2009 MACK CXU613 DAYCAB (INOPERABLE) (A50854)
2009 MACK CXU613...
2016 CATERPILLAR TL642C TELESCOPIC FORKLIFT (A51242)
2016 CATERPILLAR...
Kraus Drive Over Fertilizer Conveyor (A50514)
Kraus Drive Over...
Craftsman T1800 42in. Riding Mower (A49346)
Craftsman T1800...
PAIR OF 29 FT PIPE RACKS (A50854)
PAIR OF 29 FT PIPE...
 
Top