Jan 31, 2016 / Trenching for Utilities... #31 2 2458n Veteran Member Joined Mar 16, 2010 Messages 2,113 Check into directional boring. If they work in the area they know the requirements. My machine only carried 400 ft. of rod-500 ft. possible with a 24x40 Vermeer machine. One day job. Entry and exit holes only above ground disturbance.
Check into directional boring. If they work in the area they know the requirements. My machine only carried 400 ft. of rod-500 ft. possible with a 24x40 Vermeer machine. One day job. Entry and exit holes only above ground disturbance.