This is weird. I'm having a barn built, and to get to lower level I had pressure treated stairs put in with a 4x4ft landing at top (My idea). Two posts were augered in. One stair stringer is attached to a retaining wall. I told them I'll need to dig down then use scrap 2x6s treated on two sides so I can backfill it, walk over to deck.
I just backhoed and raked it and the one post is 30" long sitting on dirt! Shouldn't it be augered in?
I haven't made final payment, and wonder what to do. Can I drill a hole beside it, attach post to it (parallel)? All along I've been helping, doing some of the work, but although it seems sturdy now, it can't be right.
View attachment 613188View attachment 613189View attachment 613190View attachment 613192View attachment 613193View attachment 613194