What implement(s) do I need?

   / What implement(s) do I need? #11  
If the construction of the house/buildings will be started soon, I say just mow it with a rough cut mower.
If you work the ground up now, when it rains or snow melts, the ground will turn to mud. The deeper the ground gets tilled, the deeper the mud.

Wet ground with cornstalks on it is much firmer than worked up ground.
 
 

Tractor & Equipment Auctions

2015 Jeep Compass SUV (A56859)
2015 Jeep Compass...
2013 Ford F-750 Pak-Mor 16 CuYd Rear Loader Garbage Truck (A56858)
2013 Ford F-750...
2018 Chevrolet Tahoe SUV (A55853)
2018 Chevrolet...
2015 JOHN DEERE 35G EXCAVATOR (A52707)
2015 JOHN DEERE...
2023 Toyota Rav4 AWD SUV (A55853)
2023 Toyota Rav4...
2017 Yale GLC050VX 3,500 lb LPG Forklift - Powershift, Aux Hydraulics (A56435)
2017 Yale GLC050VX...
 
Top