May 31, 2012 / What should I watch out for in buying a 425? #11 T TimS Silver Member Joined Dec 12, 2006 Messages 183 Tony, you don't absolutely need the rockshaft cylinder shutoff, but it will improve the speed of the blade movement.
Tony, you don't absolutely need the rockshaft cylinder shutoff, but it will improve the speed of the blade movement.
Jun 1, 2012 / What should I watch out for in buying a 425? Thread Starter #12 OP T thenrie New member Joined May 18, 2012 Messages 6 Location Stafford, VA Tractor Cub Cadet 1650, 682 Thanks. I'll pick one up along with the port kit I'll need. The tractor currently only has valve ports for the deck.
Thanks. I'll pick one up along with the port kit I'll need. The tractor currently only has valve ports for the deck.
Aug 16, 2015 / What should I watch out for in buying a 425? #13 B bern1bern New member Joined Aug 16, 2015 Messages 2 Location Lakeville, MN Tractor JD 425 I have a JD 425 with a worn transmission dipstick also. Did you ever find out what was causing this? Thanks bern
I have a JD 425 with a worn transmission dipstick also. Did you ever find out what was causing this? Thanks bern
Aug 16, 2015 / What should I watch out for in buying a 425? #14 B beenthere Super Star Member Joined Aug 16, 2001 Messages 18,513 Location Southern Wisconsin, USA Tractor JD_4x2_Gator, JD_4300, JD_425, JD_455 AWS, added JD_455, JD_110, JD_X485(sold) I'll take a look at my 425 for a worn dipstick. Never have heard of it before.
Aug 16, 2015 / What should I watch out for in buying a 425? #15 B buckshot721 Silver Member Joined Jun 8, 2010 Messages 115 Location Auburn Mi Tractor All John Deere 425 x485 2305 4x2 Gator L130 If and when you do the cam change, there is a guy on e-bay selling the complete kit for about $300. (all JD parts plus a instructions) Its not hard took me about 3hrs start to finish, plus you don't have to pull the engine.
If and when you do the cam change, there is a guy on e-bay selling the complete kit for about $300. (all JD parts plus a instructions) Its not hard took me about 3hrs start to finish, plus you don't have to pull the engine.