riptides
Super Member
Hello,
I have attached a picture of some concrete work I need to think about. We are in the process of restoring an old dairy farm. The barn was used for dairy operations but I will be turning it over to the horses.
All the old pipes have been removed (not the support pipes), the cattle holders and feeding/milking stations. The concrete work is raised from the center isle. I have two options:
- Bust out from the center to the foundation and replace with
massive amounts of stone dust
- Fill with new concrete to level over feeding station
Give me ideas, thoughts and possible gotchas.
Area to be resurface for possible concrete would be about 36 wide 120 long, 10 - 18" high.
Area to be possibly removed for stalls 12X12X120 X2 (both sides of center isle).
-Mike Z. /forums/images/graemlins/grin.gif
I have attached a picture of some concrete work I need to think about. We are in the process of restoring an old dairy farm. The barn was used for dairy operations but I will be turning it over to the horses.
All the old pipes have been removed (not the support pipes), the cattle holders and feeding/milking stations. The concrete work is raised from the center isle. I have two options:
- Bust out from the center to the foundation and replace with
massive amounts of stone dust
- Fill with new concrete to level over feeding station
Give me ideas, thoughts and possible gotchas.
Area to be resurface for possible concrete would be about 36 wide 120 long, 10 - 18" high.
Area to be possibly removed for stalls 12X12X120 X2 (both sides of center isle).
-Mike Z. /forums/images/graemlins/grin.gif