Here is the situation: i want to put drainage around and in our horse paddock. Need to make about 600ft of trench about 1.5ft deep, 1ft wide.
Received and estimate of 2000$ from a mini-backhoe operator to do the job.
So, i've got a 2000$ motivation to do it myself.
Reading through the trencher / spade threads i did see a couple of possible solutions but there is 1 problem:
300ft needs to be dug as close as possible to the fencing (borderline of our property), so i mean inches from, not feet.
I had an idea last night about a trencher, give me your thoughts on it:
Imagine a 1ft tube, 4ft long positioned next to the tractor (longitudinal) swivel mounted to an attachement for the 3pt.
By swiveling the tube (say a 30 degrees angle max) and lowering the 3pt the edge of the tube will bite into the ground and scrape/cut a layer of ground which will be pushed up the tube and fall out of the back of the tube. There a plate is mounted to re-direct the ground to the side of the trench.
By making multiple passes you could make a trench. Say you take of 3 inches at a time. (how much HP for a 15" cutting edge??)
Attached a drawing of what i try to explain above.
Received and estimate of 2000$ from a mini-backhoe operator to do the job.
So, i've got a 2000$ motivation to do it myself.
Reading through the trencher / spade threads i did see a couple of possible solutions but there is 1 problem:
300ft needs to be dug as close as possible to the fencing (borderline of our property), so i mean inches from, not feet.
I had an idea last night about a trencher, give me your thoughts on it:
Imagine a 1ft tube, 4ft long positioned next to the tractor (longitudinal) swivel mounted to an attachement for the 3pt.
By swiveling the tube (say a 30 degrees angle max) and lowering the 3pt the edge of the tube will bite into the ground and scrape/cut a layer of ground which will be pushed up the tube and fall out of the back of the tube. There a plate is mounted to re-direct the ground to the side of the trench.
By making multiple passes you could make a trench. Say you take of 3 inches at a time. (how much HP for a 15" cutting edge??)
Attached a drawing of what i try to explain above.