nuffer460
Bronze Member
- Joined
- Feb 19, 2010
- Messages
- 94
- Location
- Niagara County, Western New York
- Tractor
- 2008 NorTrac 254/ NT700 FEL, Massey 44 with Cultivator, Nuffield460/ 36A FEL
Some places that don't have their own scales, use the size of the loaders bucket. If they have a 3 yard loader bucket, that's 3 full buckets and a half. In reality, it would be a third if a bucket. It's just hard to walk into the pile and get a third. So it usually ends up being half. That is how a past employer wanted us to load topsoil for customers. By the yard, almost always works out in the customers favor.:thumbsup:
Tonage can be a hard thing too. The size of the load can vary, from the amount of moister in it. 20 tons of stone with 5% moisture is larger than a 20 ton load at 25% moisture. ( Like after a heavy rain)::confused2:
Tonage can be a hard thing too. The size of the load can vary, from the amount of moister in it. 20 tons of stone with 5% moisture is larger than a 20 ton load at 25% moisture. ( Like after a heavy rain)::confused2: