Gordon Gould
Super Member
- Joined
- Apr 1, 2007
- Messages
- 6,640
- Location
- NorthEastern, VT
- Tractor
- Kubota L3010DT, Kubota M5640SUD, Dresser TD7G Dozer
I have a grapple on my bucket which I control from a rear remote valve. There are two 1/4" hydraulic hoses about 14' long running from the RR QDs to a set of QDs mounted on the FEL near the grapple.
I am going to add a new valve mounted near the FEL valve to control the grapple and use the rear remote for a hydraulic top link.
Can I cut these long hoses and have the appropreate fittings added to give me two sets of hoses? One set from the grapple QDs to the work ports on my new valve and one set from the rear remote QDs to the new toplink cylinder.
I am plowing new ground here so this may be stupid or just penny wise and pound foolish. Let me know - Thanks
gg
I am going to add a new valve mounted near the FEL valve to control the grapple and use the rear remote for a hydraulic top link.
Can I cut these long hoses and have the appropreate fittings added to give me two sets of hoses? One set from the grapple QDs to the work ports on my new valve and one set from the rear remote QDs to the new toplink cylinder.
I am plowing new ground here so this may be stupid or just penny wise and pound foolish. Let me know - Thanks
gg