dmay
Gold Member
JD 54" QH Snowblower
01 - 54" QH snowblower
02 - spout cable
03 - hydraulics
04 - snowblower drive shaft
Snowblower removal
05 - remove spout cable
06 - coil spout cable around chute
07 - disconnect chute rotation hydraulics and coil around chute
08 - leave QH hydraulics connected
09 - disconnect snowblower driveshaft and place on support rod
10 - unlock front hitch levers
11 - use a dolly for easy snowblower storage moving
Quick Hitch Removal
12 - lift QH and slide dolly under snowblower
13 - lower QH and back away. Use dolly to move snowblower.
14 - raise QH
15 - disconnect QH hydraulics and coil for storage, unlock levers, lift and remove QH
Front PTO driveshaft and front hitch removal
16 - disconnect front PTO driveshaft at mid pto. Pull back on colar to release. Move forward to clear mid pto.
17 - move driveshaft rearward to pull out of front pto bearings
Front PTO hitch removal
18 - to remove front pto hitch
19 - pull out retainer rod and lift out hitch assembly
Final Steps
20 - Almost done. Now service and grease all components removed so they are ready to go next time.
01 - 54" QH snowblower
02 - spout cable
03 - hydraulics
04 - snowblower drive shaft
Snowblower removal
05 - remove spout cable
06 - coil spout cable around chute
07 - disconnect chute rotation hydraulics and coil around chute
08 - leave QH hydraulics connected
09 - disconnect snowblower driveshaft and place on support rod
10 - unlock front hitch levers
11 - use a dolly for easy snowblower storage moving
Quick Hitch Removal
12 - lift QH and slide dolly under snowblower
13 - lower QH and back away. Use dolly to move snowblower.
14 - raise QH
15 - disconnect QH hydraulics and coil for storage, unlock levers, lift and remove QH
Front PTO driveshaft and front hitch removal
16 - disconnect front PTO driveshaft at mid pto. Pull back on colar to release. Move forward to clear mid pto.
17 - move driveshaft rearward to pull out of front pto bearings
Front PTO hitch removal
18 - to remove front pto hitch
19 - pull out retainer rod and lift out hitch assembly
Final Steps
20 - Almost done. Now service and grease all components removed so they are ready to go next time.
Attachments
-
01.jpg186 KB · Views: 452
-
02.jpg187.8 KB · Views: 398
-
03.jpg217.9 KB · Views: 394
-
04.jpg188.1 KB · Views: 415
-
05.jpg185 KB · Views: 380
-
06.jpg153.9 KB · Views: 260
-
07.jpg157 KB · Views: 271
-
08.jpg241.9 KB · Views: 310
-
09.jpg196.4 KB · Views: 358
-
10.jpg143 KB · Views: 312
-
11.jpg171 KB · Views: 386
-
12.jpg139.9 KB · Views: 356
-
13.jpg166.8 KB · Views: 384
-
14.jpg170.5 KB · Views: 460
-
15.jpg181.1 KB · Views: 446
-
16.jpg118.4 KB · Views: 373
-
17.jpg166.3 KB · Views: 359
-
18.jpg124.1 KB · Views: 404
-
19.jpg141.4 KB · Views: 381
-
20.jpg158.6 KB · Views: 386