As an engineer, this strikes close to home. Many engineers are told to solve a problem and given constraints, usually time and money. I had a contractor complain about a design I did, I had 5 days on site, then 4 weeks to prepare the design, calculations, drawings, tender docs etc, and I couldn't access the equipment, only look from 60+ ft away. The drawings I had to work from were not as-built and were really bad to non-existing.
They had hanging scaffolding, manlifts and over 3 years to do the install, but complained to me when the dimensions caused minor pipe interferences (despite the note to co-ordinate with existing services.)