Big Bertha Stopped In Her Tracks.

   / Big Bertha Stopped In Her Tracks. #51  
Looks like it was finished in March 2013: Niagara Tunnel Project - Wikipedia, the free encyclopedia and the reason it was moved was that the original route had too much soft rock.They moved into harder rock.

Aaron Z

Part of the story left out there. They were supposed to have stayed in the hard rock from day one but the contractor took a "money making" detour into the soft rock.Then back to the hard rock after the cave ins.
 
   / Big Bertha Stopped In Her Tracks. #52  
Part of the story left out there. They were supposed to have stayed in the hard rock from day one but the contractor took a "money making" detour into the soft rock.Then back to the hard rock after the cave ins.
Ah, that makes sense.

Aaron Z
 

Tractor & Equipment Auctions

2012 Ford Transit Connect Van, VIN # NM0LS6BNXCT106832 (A55788)
2012 Ford Transit...
1706 (A54756)
1706 (A54756)
2010 Ford Edge SE SUV (A51694)
2010 Ford Edge SE...
2020 Isuzu NPR Heil 8RLDB 8CuYd Rear Loader Garbage Truck (A52377)
2020 Isuzu NPR...
Forklift Safety Basket Attachment (A53421)
Forklift Safety...
2003 Pierce Spartan Pumper Fire Truck (A51692)
2003 Pierce...
 
Top