Looks like it was finished in March 2013: Niagara Tunnel Project - Wikipedia, the free encyclopedia and the reason it was moved was that the original route had too much soft rock.They moved into harder rock.

Aaron Z

Part of the story left out there. They were supposed to have stayed in the hard rock from day one but the contractor took a "money making" detour into the soft rock.Then back to the hard rock after the cave ins.
 
   / Big Bertha Stopped In Her Tracks. #52  
Part of the story left out there. They were supposed to have stayed in the hard rock from day one but the contractor took a "money making" detour into the soft rock.Then back to the hard rock after the cave ins.
Ah, that makes sense.

Aaron Z
 

Tractor & Equipment Auctions

(INOP) NEW HOLLAND L328 WHEELED SKID STEER (A51242)
(INOP) NEW HOLLAND...
1977 Ford F-100 Ext. Cab Pickup Truck (A53422)
1977 Ford F-100...
Electric Mobility Scooter (A54815)
Electric Mobility...
ATLAS XAS110 COMPRESSOR (A52472)
ATLAS XAS110...
2013 ISUZU NPR STAKE BODY TRUCK (A54313)
2013 ISUZU NPR...
3093 (A55787)
3093 (A55787)
 
Top