buckeyefarmer
Epic Contributor
My design came out to 500' per ton which created a 62' slinky. I have an extra 100' each way to get to where the slinky is buried, so I actually have 200' straight into a 500' slinky, per ton. The design software lets you easily change type of loop, and it automatically calculates it for you. you use less total pipe for straight loops, but you dig a lot of trench. A slinky uses just a little bit more pipe, but pipe is cheap, and the digging for slinkies is much much less.