Excavating/grading question

   / Excavating/grading question #11  
I bought myself a topcon laser level last year and that thing has paid for itself already. Sometimes you don't realize how much change in grade you are dealing with. Especially usefull for drainage work. You don't go too deep in one spot and then find you have no drop left to get where your are going.
 
   / Excavating/grading question
  • Thread Starter
#12  
Seems like a lot of dirt to move. Go big or go home. Like someone said, excavator and dozer. I did not follow your intentions closely but have done a lot of earth moving lately and much included changing grade.

The problems I kept running into were:

Places to put surplus material
Places to get extra material, sometime the surplus material was not suitable.
When changing a grade, it is often difficult to know where to stop. You can keep getting into bigger and bigger trouble without building retaining walls and that becomes expensive.

When I built my drive shed, the earth moving guy estimated around a thousand bucks or so. It turned into about eight times that! Two hundred truck loads later! And I still have an issue with the grade to the approach to my house, which is now too steep, plus my water lines froze because I removed cover!


That is why I am thinking of doing this all at once. The excavated dirt from section A would go to section B to fill/level. Little to no trucking dirt in or out.
 
   / Excavating/grading question #13  
No more comment on culvert as I'm not familiar with your local codes.

Wheeled loader would move your material nicely. Shape your borrow area so patio drainage is provided for and negate the use of a retaining wall. The big boulders? Landscaping plans?
 
   / Excavating/grading question
  • Thread Starter
#14  
Here is another pic. Ignore the pool. That was speculation that was quickly nixed.

wheatlands.jpg


The retaining wall would be halfway between the pool and the two squares above it which are horseshoe pits.
This shot also better highlights my septic lines - so driving heavy equipment over that (bulldozer) is probably not a good idea. My septic lines are about 6' underground. My septic guy says a bobcat or tractor would be fine - no D11 Cat dozers though!
The actual excavating would not be on the septic "fingers". On this pic it would be from the red line (circle) toward the horseshoe pits.
 
   / Excavating/grading question
  • Thread Starter
#15  
No more comment on culvert as I'm not familiar with your local codes.

Wheeled loader would move your material nicely. Shape your borrow area so patio drainage is provided for and negate the use of a retaining wall. The big boulders? Landscaping plans?

Culvert is more of a "safety valve" - as in if it rained for 30 straight days, water would still flow where it does now and does not create a pond in my front yard.

A wheeled loader would be great - if it could drive over the septic - or around it I guess.

The plan is probably a tiered retaining wall like this:

DSC01781.jpg


This is a driveway shot:
yard-back%2Bfrom%2Bgarage.jpg

At the edge of the house where the mulch, railroad ties, and grass meet is where the retaining wall would begin going out to the far horseshoe pit. I am thinking of replacing the railroad ties around the driveway with stone. The RR tie wall is leaning nicely anyway so I would have to replace it.
 
   / Excavating/grading question #16  
Here are two recent snow shots that show the melting snow and where the "natural waterway" is. This is where I would put the pipe so that I am not actually changing how the water runs currently.

snow_water3.jpg

I wondered if you were trying to reverse the slope from the patio to Area "A".

The closer you can estimate the material you want to take from "A" and how much you want to add to "B", the better.

One thing you might consider is running the drain at an angle toward the road ditch where your neighbor's drainage ends up. You could pick-up the grade at those four trees where the water runs now and feather that out gradually, then pick-up the grade uphill about half-way to the house from there and bring that down over and past the current low spot to make a new low spot for your drain.

If you have enough material you could come close to a steady gradual up-slope in the driveway probably. For gravel, you don't want so much slope that it washes down in a heavy rain.

Looks like a nice project. I have no idea what a fair price is.
 
   / Excavating/grading question
  • Thread Starter
#17  
Here is a pic of where the retaining wall (in red) would be. I would either curve it to the driveway or go straight to the walkway going to the patio.

retaining%2Bwall%2Byard.jpg
 
   / Excavating/grading question
  • Thread Starter
#18  
I wondered if you were trying to reverse the slope from the patio to Area "A".

The closer you can estimate the material you want to take from "A" and how much you want to add to "B", the better.

One thing you might consider is running the drain at an angle toward the road ditch where your neighbor's drainage ends up. You could pick-up the grade at those four trees where the water runs now and feather that out gradually, then pick-up the grade uphill about half-way to the house from there and bring that down over and past the current low spot to make a new low spot for your drain.

If you have enough material you could come close to a steady gradual up-slope in the driveway probably. For gravel, you don't want so much slope that it washes down in a heavy rain.

Looks like a nice project. I have no idea what a fair price is.

Not reverse, just cut it down some so that when you step off the patio into the grass you are not climbing an embankment. Area B can hold as much dirt as I can throw at it. I am planning on any dirt coming from Area A to be put in Area B and it will just lessen the "dip" from the back of the property to the road - with the focus being on building up where the driveway would be first.
 
   / Excavating/grading question #19  
Sounds like you have the plan. If you can operate a wheeled loader, rent it. You can dig out large rocks if and when encountered. If there a school bus sized rocks, leave them there for landscape appeal. An excavator would get in the way in my opinion. To finish the grade, you could use the tractor guy to do that.
 
   / Excavating/grading question #20  
Two things that I have learned by building a road, excavating for a barn and clearing fields that I suggest you meditate on:

1. What look like modest changes in grade can involve HUGE amounts of dirt. It is easy to underestimate how much dirt you will need to move.

2. It is all about cycle time. That long ride between A & B is going to eat up a LOT of seat time. Give careful thought to how long it takes to move each bucket of dirt. You might be near the break point of using a dump truck to save on tractor time.

I live northwest of Richmond and have learned that Virginia has some righteous rocks, as they say the best laid plans "gang aft aigly"
 

Tractor & Equipment Auctions

3020 (A46502)
3020 (A46502)
Amkus Rescue System (A46683)
Amkus Rescue...
2005 Big Tex 10PI 16ft. T/A Pipe Top Utility Trailer (A45336)
2005 Big Tex 10PI...
2025 Swict 78in Bucket Skid Steer Attachment (A46683)
2025 Swict 78in...
2006 General Power 6,000 Watt Generator (A46502)
2006 General Power...
2007 Cherrolet Impala Sedan (A44572)
2007 Cherrolet...
 
Top