Time for a new bridge - how to engineer?

   / Time for a new bridge - how to engineer? #41  
If you follow the cover requirements, the material the culvert is made from is not part of the load bearing calculation.

I would recommend corrugated outside, smooth inside plastic culverts which are much lighter than reinforced concrete and very easy to work with. I have both 12" and an 18" culverts crossing my driveway. Dump trucks loaded with 15 tons of gravel cross these many times each year and there has never been any problem.

Cost is not really an issue. A stick of 12" plastic culvert 20' long is about $100 at a number of local supply houses. I can carry 3 sticks on a normal lumber rack on my pickup. 18" is going to be about twice as much.
 
   / Time for a new bridge - how to engineer? #42  
Before you go all in on a round culvert, you might investigate whether there is a local structural concrete supplier that has concrete box culverts available. Box culverts are far easier to install and are engineered to support roadway loads.
 
   / Time for a new bridge - how to engineer? #43  
I read some years ago of using a railroad flat car as a bridge , they can hold tons . What about a steel flatbed off a truck , or a tractor trailer . If thats too narrow , put 2 side by side .
 
   / Time for a new bridge - how to engineer? #44  
Before you go all in on a round culvert, you might investigate whether there is a local structural concrete supplier that has concrete box culverts available. Box culverts are far easier to install and are engineered to support roadway loads.

Round culverts support roadway loads.
 
   / Time for a new bridge - how to engineer?
  • Thread Starter
#45  
Haven't been able to move forward with this project because of the almost non-stop, copious amount of rain we have been having.

Photo of an example, not the driveway that I need to work on!
 

Attachments

  • DSC07963.jpg
    DSC07963.jpg
    1 MB · Views: 236
   / Time for a new bridge - how to engineer? #46  
Yep, this rain certainly sucks. I was hoping to have my garage footer and block done now and be working on the walls/roof.

As it is, havent even got all the footer dug. And the parts that I have dug were just to tie the footer trenches in with the drain tile that will be laid in them to help things dry when it does quit raining.

If things go as planned, I will be pouring a footer monday, but may get rained out. Certainly a wetter than normal spring. Farmers havent been able to get anything done yet either. Probably gonna be more beans than corn this year...
 
   / Time for a new bridge - how to engineer? #47  
Haven't been able to move forward with this project because of the almost non-stop, copious amount of rain we have been having.

Photo of an example, not the driveway that I need to work on!

Well not every creek will fit through a twelve inch pipe.
 
   / Time for a new bridge - how to engineer? #48  
Before you go all in on a round culvert, you might investigate whether there is a local structural concrete supplier that has concrete box culverts available. Box culverts are far easier to install and are engineered to support roadway loads.

I agree, if available locally. Most precast box culvert suppliers will give you a load chart for their products. You may find a precast box will support your loads with little or no cover. Also, with the precast you have many options for a head wall. A 3 x 3 box will handle a lot of water when compared to 30 or 36 inch pipes.
 
   / Time for a new bridge - how to engineer? #49  
I agree, if available locally. Most precast box culvert suppliers will give you a load chart for their products. You may find a precast box will support your loads with little or no cover. Also, with the precast you have many options for a head wall. A 3 x 3 box will handle a lot of water when compared to 30 or 36 inch pipes.

Precast box culverts are not cheap. One of the last state projects I did we replaced a precast box in the plans with twin 36" RCPs and saved thousands. It also gave the advantage of being able to maintain the stream clean in one pipe while we installing the other in the dry then swapped sides. The environmental people like that kind of stuff.
 
   / Time for a new bridge - how to engineer? #50  
Precast box culverts are not cheap. One of the last state projects I did we replaced a precast box in the plans with twin 36" RCPs and saved thousands. It also gave the advantage of being able to maintain the stream clean in one pipe while we installing the other in the dry then swapped sides. The environmental people like that kind of stuff.

I agree precast box culverts are not cheap, however a few years ago I had a double 24 inch culvert that would not handle the flow. Found a couple sections of 2 x 3 box culverts at local supplier that state wouldn't accept because tongue was damaged. Got them for not much more than transportation costs and then patched the damaged tongue after installation. Served my purpose very well and handled the flow where the double pipes would overtop.
 
   / Time for a new bridge - how to engineer? #51  
I agree precast box culverts are not cheap, however a few years ago I had a double 24 inch culvert that would not handle the flow. Found a couple sections of 2 x 3 box culverts at local supplier that state wouldn't accept because tongue was damaged. Got them for not much more than transportation costs and then patched the damaged tongue after installation. Served my purpose very well and handled the flow where the double pipes would overtop.
Yes you got a bargain but to move forward on a new project you have to look at retail cost delivered to the site of new material. Last I checked (and it has been a while) box culvert had to be seven feet square to be cheaper then the equivalent round pipe.
 
   / Time for a new bridge - how to engineer? #52  
I'm not trying to be argumentative but I go back to the OP's original post.
He has a water crossing that he needs to get loaded gravel trucks over. My suggestion is merely to look around to see what may be available locally. Sometimes you run on to a deal that will work without paying retail price. A small precast box if obtained right will solve his problem with little concern of failing under his loaded trucks and provide the drainage capacity he needs.
 
   / Time for a new bridge - how to engineer? #53  
I'm not trying to be argumentative .
None of us are but it does sound that way more often then not. :) Nothing wrong with a vigorous debate especially if you can bring forward some facts to support your position.
 
   / Time for a new bridge - how to engineer? #54  
I'm not trying to be argumentative .
None of us are but it does sound that way more often then not. :) Nothing wrong with a vigorous debate especially if you can bring forward some facts to support your position.
 
   / Time for a new bridge - how to engineer?
  • Thread Starter
#55  
Well a wet Spring and complicated schedule put this project off until this week (in the heat). I finally decided on a culvert; smooth bore 12" plastic pipes side-by-side with a good covering of DGA (dense grade aggregate). Definately time to stop driving over the old wooden death-trap.

There is probably now more water moving capacity since it was pretty silted up under the old bridge. But you want to see pictures, don't you? Here you are:
 

Attachments

  • DSC_0009-001.jpg
    DSC_0009-001.jpg
    1.1 MB · Views: 265
  • DSC_0012-001.jpg
    DSC_0012-001.jpg
    1.2 MB · Views: 242
  • DSC_0014-001.jpg
    DSC_0014-001.jpg
    1.2 MB · Views: 251
  • DSC_0018-001.jpg
    DSC_0018-001.jpg
    1.1 MB · Views: 250
  • DSC_0020-001.jpg
    DSC_0020-001.jpg
    1.2 MB · Views: 259
  • DSC_0021-001.jpg
    DSC_0021-001.jpg
    1.1 MB · Views: 253
   / Time for a new bridge - how to engineer? #57  
Thanks for the up date. Of course we want to see the pictures of the next high water to see how well it did.
 
   / Time for a new bridge - how to engineer? #58  
Nice job and definitely safer than the old bridge. I think you should be ashamed of yourself though, for not having one picture of your tractor in this thread. ;)
 
   / Time for a new bridge - how to engineer? #59  
Nice job and definitely safer than the old bridge. I think you should be ashamed of yourself though, for not having one picture of your tractor in this thread. ;)
:laughing::thumbsup:
 
   / Time for a new bridge - how to engineer? #60  
First, I will admit I only read the first page of this thread. But I agree with the idea of using culverts instead of a bridge. I disagree with the use of a small truck vs. a large truck.

How far is it from the top of the bridge to the bottom of the ditch? I see some suggestions for what seems to be a large culvert compared to the depth. You may be surprised to learn how much build it takes to slope up and across a culvert that extends much above the ground level. I would use more than one culvert but smaller. It currently looks like a triangle ditch, so calculate the area under the bridge and size your culverts accordingly.

You said the ditch usually has very little water flowing in which case the smaller culverts will flow more water. It is a fact that the volume of a 24" culvert is more than 2 12" culverts. However, with just 2" of water flowing, more water can move through 2 12" culverts than 1 24". The volume being approximately 24.8" and 18" respectively. But at full volume it would take 4 12" culverts to equal 1 24". 3 8" culverts allow 1/3 more than 2 12". Basically if the ditch is wide enough but not very deep, you may consider smaller culverts.
 

Tractor & Equipment Auctions

Crown RM6025-45 4,500 LB Stand-On Electric Forklift (A59228)
Crown RM6025-45...
UNUSED FUTURE FT90 PLATE COMPACTOR (A52706)
UNUSED FUTURE FT90...
2005 JLG Skytrack 10054 10K Capacity Telehandler (A59213)
2005 JLG Skytrack...
2021 BOBCAT S66R SERIES SKID STEER (A60429)
2021 BOBCAT S66R...
2013 CATERPILLAR 308E CR EXCAVATOR (A60429)
2013 CATERPILLAR...
HIGH END MINI GOLF CART (A58214)
HIGH END MINI GOLF...
 
Top