"If you are working with soil and not rock and gravel it's pretty difficult to build a road bed that won't just wash out. Any place you build a switchback will likely need some drainage pipe or big-O to prevent rain erosion." trials
do you have an elevation map of the area? contours? how long is the run? to me it's all about water drainage on the slope as much as equip to do the job. if you want it to look as good as the 1st pass on the trail in 5 years time, look at drainage and plan accordingly. culverts part of the plan? just as your tractor, it's all about hydraulics....having said that, lets hope for moisture in the upcoming season.....bb
do you have an elevation map of the area? contours? how long is the run? to me it's all about water drainage on the slope as much as equip to do the job. if you want it to look as good as the 1st pass on the trail in 5 years time, look at drainage and plan accordingly. culverts part of the plan? just as your tractor, it's all about hydraulics....having said that, lets hope for moisture in the upcoming season.....bb
Last edited: