dodge man
Super Star Member
I also don’t get it. I’ve done some of it through work. We take cores to determine pavement thickness. Asphalt is easy, concrete takes some work. We usually take 4 inch cores. You need an electric source and a water source.
It takes about a 6000 watt generator and we usually get about 300 gallons of water in a tank. We put it all on a trailer of mine. It basically just a high quality drill rig mounted on a stand that is waist high. The water is for cooling the bit and yes the bits are diamond bits that look like a hole saw and are expensive. I think for the bit and the core drill machine are like $150 for a day.
It takes about a 6000 watt generator and we usually get about 300 gallons of water in a tank. We put it all on a trailer of mine. It basically just a high quality drill rig mounted on a stand that is waist high. The water is for cooling the bit and yes the bits are diamond bits that look like a hole saw and are expensive. I think for the bit and the core drill machine are like $150 for a day.