mykleh
Silver Member
I leveled the site BEFORE they put up the building then drove over it for the fall/winter, let the frost do its thing all winter then put in the gravel, compacted it and poured the slab in spring.. also I had them put 2" of foam then re-bar centered in then concrete.. no floor sweating and I had two drains put in as well