It shouldn’t take very long to complete the drywall. I’ve seen crews hang that size job in 2 days and finish it in 2 days. 2 weeks would be a generous amount of time. I think running the heat longer than a week after they’re done is a waste of energy. Moisture isn’t a problem here in the winter and is probably never a problem in Nevada.