Put in some time today working about a half of mile of roadway.  Torrential rains of late, causing washouts, ditch erosion, and make potholes worse than ever before.  So, the starting point was to gather and roll the edges back towards the center.  Work potholes, then draw out and start work to reestablish the crown.  Next is to clean out all the ditches, and incorporate the binder back into the roadbed.  Add a bit of gravel and dress it down and then roll it it in.
While over at the neighbor’s place a 30k pound excavator was brought in to pull a well drilling rig out of a newly built driveway that now has a wet spring flowing from it. Drilling rig was almost at roll point when the ground just gave way and it sunk to the drive axles on the back.