I'm still researching on the pour, one thing at a time though. Power screed is 14' so i think I'm ok. I've never done any of this before but I'm taking my time and doing a lot of research, and so far I think it's come along ok. In the beginning I was scared to dig the footer, and lay block. But now i've been able to overcome these fears.
Got the pex all laid in and clipped. I need to pick up long turn 90* 1.5" pvc, each run will go 2 in 1 to come out of the concrete and meet up with the manifold. I'm going to leave them long and put the manifold hanging over the back wall while the pour is done, then when the pad is set I'll go back in and trim off the excess. I'll have the tubes pressurized during the pour as well to prevent potential crushing. There's 700 pex clips and ~1600ft of pex tubing totaling only 16.3 gallons of fluid.
The right side was done first. And it's a bit of a mess compared to the left. I may redo it honestly.
Got the pex all laid in and clipped. I need to pick up long turn 90* 1.5" pvc, each run will go 2 in 1 to come out of the concrete and meet up with the manifold. I'm going to leave them long and put the manifold hanging over the back wall while the pour is done, then when the pad is set I'll go back in and trim off the excess. I'll have the tubes pressurized during the pour as well to prevent potential crushing. There's 700 pex clips and ~1600ft of pex tubing totaling only 16.3 gallons of fluid.
The right side was done first. And it's a bit of a mess compared to the left. I may redo it honestly.