Diggin It
Super Star Member
Well, it's all moot now. No longer possible for me to do the way I was thinking.
They came through and paved yesterday. They added enough width and thickness and changed the edge profile so that I can't possibly drive along the edge. The end tines wouldn't be able to get deep enough before the tineless end would be dragging on the pavement and it's now too steep for me to drop one wheel off and be safe. With the 5' rake width, I don't have enough width outside the tires to get the end tines to the ditch now either.
Back to using the hand shovel and hoe to clean out the culvert the hard way.
They came through and paved yesterday. They added enough width and thickness and changed the edge profile so that I can't possibly drive along the edge. The end tines wouldn't be able to get deep enough before the tineless end would be dragging on the pavement and it's now too steep for me to drop one wheel off and be safe. With the 5' rake width, I don't have enough width outside the tires to get the end tines to the ditch now either.
Back to using the hand shovel and hoe to clean out the culvert the hard way.