3-Point Hitch 110 TLB-Installing/Removing 3PH

   / 110 TLB-Installing/Removing 3PH #1  

RaytheOne

Bronze Member
Joined
Apr 12, 2004
Messages
94
Location
KY
Tractor
JD 323D
Just looking for advice or feedback on how involved the 3PH installation is? Since the BH is on, I'm trying to get some projects done with it before I make the switch to 3PH operation. Right now, everything looks like a hole to be dug, :D but I need to make room to take the backhoe off and put on some other attachments.

Most important is getting my splitter hooked up.

Thanks!
 
   / 110 TLB-Installing/Removing 3PH #2  
Usually it is a five to ten minute job for me to remove the hoe since I have a cab on mine. Installing the three point hitch takes another five minutes.

When I remove the hoe I do block it up with wood blocks incase the cylinders leak down some. I also clean and grease the large upper pins to make them slide in easier.

Once you do it a couple of times it is a simple thing to do.
 
   / 110 TLB-Installing/Removing 3PH #3  
Removing and re-attaching the hoe takes less time than hooking up the 3pt. Dropping the hoe takes 2 minutes and it's about the same to pick it up again.

Because I have the top n tilt for my 110; routing (wrestling) the hyd hoses and the cylinders is more of a challange than the hoe - IMO.

AKfish
 

Tractor & Equipment Auctions

(INOPERABLE) GEHL 8K TELEHANDLER (A58214)
(INOPERABLE) GEHL...
2015 TEXAS PRIDE TRAILER  30 FLATBED GOOSENECK TRAILER (A58214)
2015 TEXAS PRIDE...
KOMATSU WA270 (A58214)
KOMATSU WA270 (A58214)
2015 Freightliner M2 106 Terex Hi-Ranger TL55 55ft. Insulated Material Handling Bucket Truck (A60460)
2015 Freightliner...
2014 International WorkStar 7300 4x4 Altec AA55E 55ft. Material Handling Bucket Truck (A60460)
2014 International...
2014 Ford F-250 Ext. Cab Service Truck (A59230)
2014 Ford F-250...
 
Top