k0ua
Epic Contributor
Around here we get what is called 0 to 3/4 which is dust all the way to 3/4 of an inch. It makes a great drive when packed and level, but on a bad slope, it will wash out. To make a built up level base for a building we use 0 to 6 inch , and then top it with 0 to 3/4 for leveling. Last year this was about $100 per 7 yard load. (2 axle truck) or about 200 for a 3 axle truck or around 16 yards. I try to keep a good friendship with our local dirt/gravel guy. Over the years I have bought many loads of the gravel and of various grades of dirt. And people still ask me "why do you have a tractor?" By the way 7 tons sounds like a lot, but that is about a 10 minute job to move it, and not much more to spread and smooth it. It doesnt go all that far.
James K0UA
James K0UA